Powering Industrial Growth in Algeria

Powering Industrial Growth in Algeria

To address critical power instability at a building materials factory in Oran—where grid failures caused production halts and equipment damage—we installed a 200kW refurbished Cummins generator with automatic transfer switch. This reliable power solution enabled continuous operation of mixing and processing equipment, increasing productivity by over 40% while eliminating material waste.

Project Case: Ensuring Stable Production Power for an Algeria Building Materials Processing Plant

Client: A medium-sized building materials processing plant in Oran, Algeria

Industry: Building Materials Manufacturing

Core Need: Resolving frequent shutdowns of concrete mixers and processing equipment caused by unstable power grids

Client Dilemma: Unstable power supply threatens business survival

This plant, specializing in concrete blocks and prefabricated building materials, faced significant challenges:

  1. Frequent production interruptions – Grid voltage fluctuations and daily outages caused sudden shutdowns of mixers, resulting in the loss of entire batches of raw materials.
  2. Risk of Equipment Damage – Unstable voltage caused persistent damage to precision motors and control systems.
  3. Delivery Delays – Failure to meet production schedules led to increased customer complaints and the risk of lost orders.
  4. High Maintenance Costs – Frequent power outages accelerated equipment aging, resulting in skyrocketing repair costs.

 

ELECPRIME Customized Power Solutions

After a video site survey and technical analysis, we provided a targeted solution:

Product Configuration:

One 200kW Refurbished Cummins diesel generator sets

 

Reasons for selection:

  1. Perfectly matched to the peak load of all equipment operating simultaneously in the factory
  2. Cummins engines’ durability is well-suited to Algeria’s dusty environment
  3. The refurbishment solution saved the customer 45% in costs, offering excellent value for money

 

Customization:

  1. Equipped with an automatic transfer switch (ATS) for seamless switching between the grid and the generator
  2. Installed with a heavy-duty air filter to address the local sandy and windy climate
  3. Provided with a simple operating guide (in Arabic) for quick familiarity by local staff

Results: Significantly improved production efficiency

 

Immediate results from the project:

  1. Improved production continuity – Power supply is stable, and capacity utilization has increased from 65% to 92%
  2. Significant cost savings – Raw material waste has been reduced by 80%, saving approximately $3,800 per month
  3. Comprehensive equipment protection – Stable voltage extends equipment life
  4. Smooth business expansion – Thanks to its reliable delivery capabilities, it has successfully secured multiple new project contracts.

 

Customer Testimonial:

This generator has completely transformed our production. Now, even during a city-wide power outage, we can continue production. ELECPRIME not only provided the equipment, but also gave us the confidence to continue growing.”

—Mr. Ahmed Bensalem, factory owner