To address critical power instability at a building materials factory in Oran—where grid failures caused production halts and equipment damage—we installed a 200kW refurbished Cummins generator with automatic transfer switch. This reliable power solution enabled continuous operation of mixing and processing equipment, increasing productivity by over 40% while eliminating material waste.
Project Case: Ensuring Stable Production Power for an Algeria Building Materials Processing Plant
Client: A medium-sized building materials processing plant in Oran, Algeria
Industry: Building Materials Manufacturing
Core Need: Resolving frequent shutdowns of concrete mixers and processing equipment caused by unstable power grids
Client Dilemma: Unstable power supply threatens business survival
This plant, specializing in concrete blocks and prefabricated building materials, faced significant challenges:
- Frequent production interruptions – Grid voltage fluctuations and daily outages caused sudden shutdowns of mixers, resulting in the loss of entire batches of raw materials.
- Risk of Equipment Damage – Unstable voltage caused persistent damage to precision motors and control systems.
- Delivery Delays – Failure to meet production schedules led to increased customer complaints and the risk of lost orders.
- High Maintenance Costs – Frequent power outages accelerated equipment aging, resulting in skyrocketing repair costs.
ELECPRIME Customized Power Solutions
After a video site survey and technical analysis, we provided a targeted solution:
Product Configuration:
One 200kW Refurbished Cummins diesel generator sets
Reasons for selection:
- Perfectly matched to the peak load of all equipment operating simultaneously in the factory
- Cummins engines’ durability is well-suited to Algeria’s dusty environment
- The refurbishment solution saved the customer 45% in costs, offering excellent value for money
Customization:
- Equipped with an automatic transfer switch (ATS) for seamless switching between the grid and the generator
- Installed with a heavy-duty air filter to address the local sandy and windy climate
- Provided with a simple operating guide (in Arabic) for quick familiarity by local staff
Results: Significantly improved production efficiency
Immediate results from the project:
- Improved production continuity – Power supply is stable, and capacity utilization has increased from 65% to 92%
- Significant cost savings – Raw material waste has been reduced by 80%, saving approximately $3,800 per month
- Comprehensive equipment protection – Stable voltage extends equipment life
- Smooth business expansion – Thanks to its reliable delivery capabilities, it has successfully secured multiple new project contracts.
Customer Testimonial:
“This generator has completely transformed our production. Now, even during a city-wide power outage, we can continue production. ELECPRIME not only provided the equipment, but also gave us the confidence to continue growing.”